Urgent Wind Turbine Blades & Solar Components Transport by Cargo Aircraft
Urgent wind turbine blades and solar components transport by dedicated cargo aircraft. Nacelles, generators, inverters, monopiles. Express delivery for wind and solar farms. Quote 24/7.
Frequently Asked Questions
Everything you need to know about our services
Can a wind turbine blade be transported by cargo aircraft?
Next-generation onshore wind turbine blades measuring 60 to 80 meters do not fit in a standard cargo aircraft. However, we air-freight the critical nacelle components — generator, gearbox, pitch system, main bearings — as well as replacement blades for medium-power turbines (up to 25 meters) and pre-assembled blade sections for on-site repair.
Which solar components require urgent air transport?
Emergency situations primarily involve central inverters (500 kW to 4 MW) whose failure immobilizes an entire section of the solar farm, substation transformers, damaged solar trackers, and SCADA control modules. A faulty central inverter at a 100 MWp solar farm can cause production losses of €15,000 to €40,000 per day.
What is the delivery time for a critical wind turbine component?
Our cargo charter service guarantees delivery within 12 to 36 hours depending on origin (Europe, China, United States) and destination of the wind or solar farm. Components are collected directly from the OEM manufacturer (Vestas, Siemens Gamesa, Goldwind, SMA, Huawei) and delivered door-to-door, customs included.