Replacement Turbine Transport by Cargo Aircraft for Power Plants
Energy, Oil & Gas

Replacement Turbine Transport by Cargo Aircraft for Power Plants

Urgent replacement turbine transport by dedicated cargo aircraft for power plants facing production halt. Rotor, stator, 5-30 tons, 12-24h delivery. Express quote.

⚡ CRITICAL 12-36h 3000-15000kg
Everything you need to know about urgent turbine transport by cargo aircraft

Frequently Asked Questions

Everything you need to know about our services

01

What types of turbines can be transported by cargo aircraft?

We transport industrial gas turbines (GE Frame 6/7, Siemens SGT-800), steam turbines, and their critical components: rotors, stators, blades, bearings, combustion chambers. Parts weighing up to 30 tons are shipped via Antonov AN-124, while lighter components (5-15 tons) travel on Boeing 747F or Ilyushin IL-76.

02

How much does a power plant production shutdown cost?

An unplanned shutdown of a combined cycle power plant rated at 400 MW represents an estimated loss between €200,000 and €800,000 per day in lost revenue on the electricity spot market, PPA contractual penalties, and substitution costs. Using an express cargo charter dramatically reduces downtime compared to standard maritime freight (weeks vs. hours).

03

How is the rotor protected during air transport?

Each turbine rotor is packaged in a custom anti-vibration cradle with calibrated shock absorbers and aviation-certified fasteners. Sealing surfaces and bearing journals are protected by rigid shells. A recording accelerometer is installed to document the absence of shocks during the flight, in compliance with OEM manufacturer requirements.

Need a quote for this type of transport?